Prosperitas Leadership Academy (P.L.A.) Private Charter School

Phase 1: The Owner is renovating and changing the use of an existing
one story with mezzanine CMU building at 4505 south Orange Blossom
Trail in Orlando Florida 32839. The existing occupancy is business and will be
change to an educational occupancy. The charter school will be occupying
students that are trying to re-enter high school grades 9-12. All exterior
walls will remain. New egress opening will be added per the new occupant load.
The existing building is currently fire sprinklered with a fire suppression system.
The fire sprinkler system will remain. There will be selective demolition.
Demolition will include some interior walls, capping of some plumbing for
reuse, and capping of electrical areas that will no longer being required.

Phase 2: Will include adding the remaining classrooms,
accessory rooms and bathrooms.

 

 

Existing Exterior

Weeks Architecture and Design – PLA Private Charter School Existing Exterior

 

Existing Exterior

 

Weeks Architecture and Design – PLA Private Charter School Existing Exterior

 

Existing Exterior

 

Weeks Architecture and Design – PLA Private Charter School Existing Exterior

 

Weeks Architecture and Design – PLA Private Charter School Exterior Elevations

Weeks Architecture and Design – PLA Private Charter School Interior Design Drawings

Phase 1 construction and demolition